Machine Rebuilds

Machine Rebuilds

Laminating press rebuild.

The press was built in the 1980's.  The press utilized relays and dozens of pushbutton switches. We removed all wiring and control components.  We installed new control cabinets using Mitsubishi controls.  We installed a PLC, VFD drives on all AC motors and PID controllers on all temperature control circuits.  All wiring and sensors were also replaced.  All final programming was done onsite.    

                               

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Laser Lift Rebuild

The Laser Lifts were originally designed by another company in 2015.  The lifts were utilizing a cable hoist to telescope the sections.  The cables were regularly getting frayed and breaking.  This would cause the lift to fail and result in safety issues. 

We redesigned the lifting mechanism to make it failsafe.  We incorporated a jackscrew to prevent any chance of free fall.  The upgrade also included a new control cabinet. The control cabinet included a VFD to provide smooth motion control and logic.